Service

System modernization

Replacement is not always the right answer. First we measure where the system is losing. Only then do we say what is worth repairing or replacing — if anything.

  • Fault finding
  • Optimisation
  • Platform migration
  • Missing documentation

When a review is worth doing

The signs that
usually come first

Repeated stoppages nobody can pin down

It happens weekly, never the same way twice, and by the time anyone gets there it has restarted.

  • The symptom and the conditions for reproducing it, written down
  • Trend recording on the suspect signals
  • In this order: supply → field signal → logic → actuator

An obsolete platform that is hard to replace

The controller or the operator panel is no longer available, and there is no spare on the shelf.

  • A migration plan and a risk assessment
  • Spare CPU and HMI configuration
  • Version control and a backup routine set up

The backup and the documentation are missing

The program exists in one copy, running on the machine, and nobody can explain it.

  • Program backup and safe storage
  • Wiring diagrams and I/O tables reconstructed
  • Software description and an operating guide
An old push-button control panel with indicator lamps, a temperature controller and a main switch
An old operator panel — push buttons, indicator lamps, an obsolete instrument: this is where the refurbishment starts

How we work

We start with measurement,
not with replacing parts

The method

“Most faults are not in the PLC but in a field device, in the wiring or in the power supply — which is why we do not start by replacing parts.”

Diagnostics

We turn the symptom into measurable data before anything gets replaced.

  • The conditions for reproducing it, written down
  • On-site measurement and trend recording
  • Following the fault chain from the power supply onwards

Optimisation

There is often headroom in the existing system — we show it from measurements.

  • Bottlenecks identified from data
  • Micro-stoppages brought to light
  • Cycle times and efficiency improved
  • VFD drives brought into the control logic

Migration and documentation

If replacement is justified, in planned steps that can be rolled back.

  • The old program onto a current platform
  • An acceptance test after the migration
  • Updated drawings, I/O list, operating instructions

What you receive at handover

  • A survey and measurement report with the causes found
  • A ranked recommendation: what pays back first
  • Program backup with source code, and a backup routine
  • Updated wiring diagrams and I/O list

We hand over the survey results even if you end up ordering the recommended work elsewhere.

Why SKY SOL

Why it is worth
calling us

Ten years in the field

The team has spent ten years in industrial environments: programming, commissioning, fault finding. We do not know machines from textbooks.

One engineer, start to finish

The same person surveys the job, writes the program and commissions it. You never have to explain the same thing twice, and nothing is lost in a handover.

The source code is yours

The program backup, the I/O list and the operating instructions are part of the handover, not a separately priced item. The system does not tie you to us.

We tell you when it is not worth it

If the measurements show that replacement will not pay back, we say so — even when that means no work for us.

Boundaries

Where our work
ends

Scope — what we do not take on

Clear boundaries

We review the control system, write the program and do the commissioning. Electrical installation, cabinet manufacturing, mechanical repair and statutory compliance inspection are not work we take on.

Why this is good for you

If the measurements show the fault is mechanical or down to the installation, we say so — even when that means no work for us.

FAQ

What people
usually ask

Does production have to stop while the work is done?

Most of the survey and the measurement is done while the plant runs. Rewiring, swapping the program and the acceptance test do need a shutdown. We estimate how long that takes in advance and fit it to a maintenance window.

The source code of the old program is gone. Can the system be saved?

It depends. If the program can be read out of the controller, it can often be run and backed up. The variable names and the comments are usually lost, though, which makes further development awkward. In that case we will say so if rewriting is the smaller risk.

How do you know the fault is really in the PLC?

Usually it is not. Most faults arise in a field device, in the wiring or in the power supply. That is why we do not start by replacing parts: we work from the supply through the field signal and the logic to the actuator, with measurements and trend recording.

When is migration worth it, and when is a repair enough?

If the platform is still available and the faults show up at a few well-defined points, repair is usually the more economical choice. We recommend migration when the controller or the HMI can no longer be bought, when there is no spare for it, or when an extension will not technically fit.

What happens if the survey shows it is not worth it?

Then we write that down. The measurement report and the documentation we reconstructed are yours anyway — even if you order the next step elsewhere.

How long does a modernization take?

We can give a deadline after the survey. The length of the job is not set by the size of the program but by how much documentation is missing and when the plant can be shut down.

Get a quote

Let us look at
the task

Describe in a few sentences what you need solved. We reply within one working day and tell you what we need in order to quote.

Phone+36 30 463 32 43 E-mailinfo@skysol.hu
Registered officeSKY SOL Kft. · Római körút 23.
6723 Szeged, Hungary — we work nationwide
What helps us quoteA description of the process, an I/O list or an estimated signal count, any existing wiring diagrams, the platform and the deadline.

To speed up the technical discussion, tell us the PLC/HMI type, the estimated I/O count, a short description of the task, the location and the deadline you need. You can send an I/O list or technical documentation to info@skysol.hu.

Fields marked are required. We reply within one working day. You can also write to us directly: info@skysol.hu